Abstract
This paper reports the fabrication and construction of the fixed roof of Toyota stadium. The fixed roof looks like a crescent moon and covers the main & back stands. It's composed of keel truss, sub-truss, combined beam and horizontal brace. This paper describes the control process of the fabrication, referring to drawing, casted steel, optimum method of welding, combination of various joint plates. Also this paper describes the erection process of the roof on site.