RISK MANAGEMENT IN CONSTRUCTION : CASE STUDY OF RISK IN SCHEDUL CONTROL USING MONTE CARLO SIMULATION
Kazuo YAMANEJun IWAMATSUKazuo FURUYAKatsuhide SUZUKI
Author information
JOURNAL FREE ACCESS

2002 Volume 8 Issue 15 Pages 319-322

Details
Abstract
The risk in terms of works due to dispersion in efficiency of construction works are analyzed using data in actual construction and Monte Carlo simulation method with PERT model. The improvement of production efficiency requires introduction of risk concept and theory of constraints (TOC) in schedule control. Especially, optimization of the whole schedule planning and feasible schedule control considering the resource constraints of persons or equipments are important.