2016 Volume 71 Issue 12 Pages 827-829
The Phase-1 commissioning of the SuperKEKB accelerator is started at February 1st, 2016. At May 9th now, the initial check and calibration of the accelerator system was completed. The integral stored beam current reaches 75% of the target value. The initial beam commissioning are reported.