Concrete Journal
Online ISSN : 2186-2753
Print ISSN : 0387-1061
ISSN-L : 0387-1061
Construction of the Hospital using HPC Structural Method
Masahiro KoshimotoKentarou Terai
Author information
JOURNAL FREE ACCESS

1983 Volume 21 Issue 10 Pages 20-27

Details
Abstract
The HPC structural method has been adopted for Sizuoka-Prefectural-General-Hospital which was designed as a probable key position for medical care activities at the time of earthquakes disaster, in Sizuoka prefecture, a designated area for possible earthquakes. In this method instead of using a conventional poured concrete, the parts of columns, beams, slabs and walls precasted in a factory are assembled at the construction site to forme the structure. This method secured a high quality of the building and enable to shorten the necessary construction period of this project. This paper demonstrates the outline of HPC structural method and its execution.
Content from these authors
© Japan Concrete Institute
Previous article Next article
feedback
Top