1983 Volume 21 Issue 11 Pages 35-48
It took 11 years to complete the Tohoku & Joetsu Shinkansen Line, because of oil pannic and another social surroundings. This paper reports about design considerations and construction methods of track system, foundation and concrete beam, considering the high speed running in the cold and heavy snow environments, constructing method of long span bridge, energy saved constructing method of middle span bridge, and rapid constructing method etc..