Abstract
High strength concrete was employed for construction of a ten story condominiums constructed by “Reinforced Concrete Layered construction system” developed by Taisei Corporation. By this construction system, precast beams and walls are combined with cast-in-place columns by placing slab concrete to form a monolithic structure. Most of papers on high strength concrete having a design strength of more than 360 kgf/cm2 presented so far merely describes the results of laboratory tests. This paper reports the records of production, placing and quality control of high strength concrete of about 2000m3 for actual structures produced in the time period of three months.