Pre-Cooling Method using Liquefied Nitrogen in Dam Concrete
K. OhsawaN. FukudaT. MoriS. OnoM. Eto
Author information
JOURNAL FREE ACCESS

1988 Volume 26 Issue 5 Pages 21-29

Details
Abstract

Ohkawase dam is a gravity dam of concrete volume approximately 110000 m3. As the technical specification requires that the temperature of placing concrete shall be below 25°C, so we adopted the pre-cooling method in the summer time, in which Liquefied Nitrogen (LN2) is injected to the concrete. By applying this method, we placed the concrete of 12000m3. This paper describes the plans and the results of consideration relating to the concreting which adopts the pre-cooling method.