Grand Renewable Energy proceedings
Online ISSN : 2434-0871
Japan council for Renewable Energy(2018)
Conference information

Study on the Heat Source System Utilizing Combined Underground Heat (Part2) The Result of First Year Operation
*Takashi SakabeHisashi WakayamaMitsuru Konno
Author information
CONFERENCE PROCEEDINGS FREE ACCESS

Pages 272-

Details
Abstract
The first stage construction of the city hall of Sakata was completed in December 2015, and the second stage construction was completed in June 2017. It is currently in operation and heat source system and air conditioning system have been operating smoothly. In addition, the heat source system satisfies the expected performance. This paper describes the outline of the thermal response, the results of heating operation in the winter season and cooling operation in the summer season.
Content from these authors
© 2018 Japan Council for Renewable Energy (JCRE)
Previous article Next article
feedback
Top