日本地熱学会誌
Online ISSN : 1883-5775
Print ISSN : 0388-6735
ISSN-L : 0388-6735
地下水流動を考慮した地中熱利用ヒートポンプの実証試験
岩田 宜己小林 利文深谷 〓三郎横原 恵一新堀 雄一
著者情報
ジャーナル フリー

2005 年 27 巻 4 号 p. 307-320

詳細
抄録

An advantage of geothermal heat pump system (i.e., ground-coupled heat pumpp system with borehole) resulting from groundwater flow has been evaluated in Omachi and Iiyama Service Stations of Chubu Electric Power Co., Inc. In Japan, it is well-known that huge amount groundwater exists with the temperature of 10∼15°C. In order to design a geothermal heat pump with higher reliability, we should consider the ground heat deriving not only from heat conduction but also from groundwater flow. At present, the drilling cost in Japan is two or three times higher than that in Europe and USA. This matter directly raises the initial cost of geothermal heat pump system installation in Japan. Some reports have suggested the advantage of groundwater flow on subsurface heat extraction rate, which may affect on the design of geothermal heat pump. However, field experiments on this topic have not sufficiently been conducted. In our experiments, the geothermal heat pump system is supplied heat from boreholes of 100 m or 70 m deep, in which U-tubes are installed. As results of Omachi site experiments, the filling material (i.e., water, silica sand or cement) of the borehole affected on thermal response in heat extraction, although a heat-extraction-rate higher than 170 W/m was recorded in a steady state for any filling material. Based on the observation results in the observation wells, the groundwater flow velocity in Omachi-site was estimated to be 1.4×10-4 m/s in Darcy fluid flow velocity. On the other hand, in Iiyama site, the flow velocity of groundwater was in the order of 10-7 m/s. Though its velocity is remarkably smaller than that of Omachi site, groundwater flow in Iiyama site also caused high efficiency of the heat exchanger in a limited time-period.

著者関連情報
© 日本地熱学会
前の記事 次の記事
feedback
Top