水素エネルギーシステム
Online ISSN : 2436-5599
Print ISSN : 1341-6995
特集
JHFC各論:WG3(車輌・インフラ共通領域)
田島 正喜
著者情報
研究報告書・技術報告書 フリー

2010 年 35 巻 3 号 p. 14-17

詳細
抄録

In WG3, the members from automobile manufacturing companies and infrastructure companies discuss about technical issues of the interface between fuel cell vehicle and hydrogen infrastructure. In this paper, the results of the WG3 activities in 2009 are reported. The problems to realize 70MPa full refueling station were examined towards 87.5MPa of maximum refueling pressure. To achieve the full refueling, the introduction of communication refueling was decided. It was observed that ―40℃ pre-cooling is necessary for 70MPa full refueling by simulation. Then, the specifications for 70MPa full refueling station were proposed and reflected to the items in the next project. In addition,th e Japanese version of refueling protocol tests was conducted and the results were reported.

著者関連情報
© 2010 一般社団法人 水素エネルギー協会
前の記事 次の記事
feedback
Top