IEEJ Transactions on Electronics, Information and Systems
Online ISSN : 1348-8155
Print ISSN : 0385-4221
ISSN-L : 0385-4221
Paper
Dynamic Scheduling of Large-scale Flow Shops
Based on Relative Priority Approach
Yang JianhuaYasutaka Fujimoto
Author information
JOURNAL FREE ACCESS

2003 Volume 123 Issue 10 Pages 1858-1864

Details
Abstract
A relative priority approach is proposed to solve dynamic scheduling problem for flow shop problem in this paper. Two neighbor jobs’ relationship is represented by a relative priority, which implies permutation obstacle between them. An algorithm is developed to calculate relative priority matrix on jobs and a near-optimal result can be obtained with the calculation iteration of relative priority matrix. A printed circuit board production line, which is composed of 31 works, is used to demonstrate the efficiency of proposed approach. It shows that an excellent final sequence can be obtained while initial sequence is derived from rule-based result.
Content from these authors
© 2003 by the Institute of Electrical Engineers of Japan
Previous article Next article
feedback
Top