電気学会論文誌D(産業応用部門誌)
Online ISSN : 1348-8163
Print ISSN : 0913-6339
ISSN-L : 0913-6339
論文
A Novel 500kW High-Speed Turbine PM Synchronous Generator Set for Distributed Power Generation
Sven WendtFrank BeneckeHenry Güldner
著者情報
ジャーナル フリー

2007 年 127 巻 5 号 p. 501-507

詳細
抄録
The paper presents a power generation system based on the cogeneration of heat and electricity with a novel high speed turbogenerator. The machine consists of a single stage steam turbine and a directly coupled permanent magnet synchronous generator in one constructional unit. A PWM IGBT rectifier is the load to the generator and a PWM IGBT three-phase four-wire inverter feeds the power into the low voltage mains. In order to increase the turbine efficiency at light load, variable speed operation of the turbogenerator is realized. Different control schemes for mains parallel operation and stand alone operation are presented. The control schemes allow for the use of a lookup table based control with a speed-power-characteristic or for the use of a maximum power point tracker. Measurement results from the successfully tested turbogenerator set are presented.
著者関連情報
© 2007 by the Institute of Electrical Engineers of Japan
前の記事 次の記事
feedback
Top