IEEJ Transactions on Power and Energy
Online ISSN : 1348-8147
Print ISSN : 0385-4213
ISSN-L : 0385-4213
Special Issue Paper
A Scheduling Operation Method of Wind Farm to Deal with Ramp Events and Evaluation of Required Battery Capacity
Kotaro YoshidaShintaro NegishiSatoshi TakayamaAtsushi Ishigame
Author information
JOURNAL FREE ACCESS

2017 Volume 137 Issue 10 Pages 687-696

Details
Abstract

Recently, the penetration of the renewable energy has been increasing. Especially, the wind power generation has focused as the technology to solve environmental problems. However, the high penetration of wind farm (WF) may have a bad influence on the power system, caused by the fluctuating power outputs. This paper proposes the scheduling operation method of WF to deal with ramp events in order to dispatch power stably and deliberately, using a battery energy storage system (BESS). And the evaluation of the BESS capacity clarifies the required BESS capacity for this method.

Content from these authors
© 2017 by the Institute of Electrical Engineers of Japan
Previous article Next article
feedback
Top