International Journal of the JSRM
Online ISSN : 2189-8405
Damage of Circular Tunnels under Millisecond Blasting-unloading in DEM
Siyu PENGYasuhiro MITANI Hiroyuki HONDA
Author information
JOURNAL OPEN ACCESS

2024 Volume 20 Issue 2 Pages 1-6

Details
Abstract
Blasting excavation of deep tunnels is a typical dynamic process subjected to in-situ stress redistribution and blast loading. This study establishes a numerical model for millisecond blasting in the DEM method for two-dimensional circular tunnel excavation. The process of millisecond blasting in a circular tunnel is depicted as a sequence of delayed multiple blastings (multiple dynamic loading-unloadings and static adjustment processes) executed on distinct blasting surfaces that are concentric with the tunnel. After calibration and verification, the dynamic stress evolution process of surrounding rock and the resulting damage to surrounding rock are investigated.
Content from these authors
© 2024 Japanese Society of Rock Mechanics

This article is licensed under a Creative Commons [Attribution-NonCommercial-NoDerivatives 4.0 International] license.
https://creativecommons.org/licenses/by-nc-nd/4.0/
Previous article Next article
feedback
Top