システム制御情報学会論文誌
Online ISSN : 2185-811X
Print ISSN : 1342-5668
ISSN-L : 1342-5668
マルチロボット溶接における長方形ワークの最適配置
勘定 義弘阿瀬 始
著者情報
ジャーナル フリー

2003 年 16 巻 5 号 p. 242-248

詳細
抄録

Increasing the productivity by reducing waiting times for collision avoidance between adjacent robots has been an important issue in multi-robot welding systems. Minimization of welding job completion time by path optimization is one of the methods for the purpose. Optimization of directions and positions of workpieces when arranging them on the working stage is more effective method. In case of rectangular workpiece, the algorithm for optimizing directions by tabu search and positions by nonlinear programming has been developed in this research. Its effectiveness is shown by numerical simulations with practical workpieces.

著者関連情報
© システム制御情報学会
前の記事 次の記事
feedback
Top