Scientiae Mathematicae Japonicae
Online ISSN : 1346-0447
TWO MACHINE FLEXIBLE SHOP SCHEDULING PROBLEM
Shintaro MohriTeruo MasudaHiroaki Ishii
著者情報
ジャーナル フリー

2021 年 84 巻 1 号 p. 1-7

詳細
抄録
We study two machine shop type scheduling problem in this paper. At shop type scheduling, one job is handled by plural machines. And it generally divided two types of problem. Flowshop type have been determined the order of operation at each machine. And it is not decided on Openshop type. In this paper, considering a problem with two machines and flexible jobs which have no strict order of machines, but have desirably order. The super shop problem which is mixed with flow shop and open shop is considered by Strusevich and suggests a solution method that based on 13 cases. In this paper, we extend this result and give more detailed condition on one case which include preemptive job. We also propose a solution to this problem by extending this result to flexible flowshop.
著者関連情報
© 2021 International Society for Mathematical Sciences
次の記事
feedback
Top