Application of Earned Value in the Korean Construction Industry
— A Case Study
Oh-cheol KwonSang-chul KimJoon-hong PaekShin-Jo Eom
著者情報
ジャーナル フリー

2008 年 7 巻 1 号 p. 69-76

詳細
抄録
Earned Value (EV) is a project control technique used in many countries which provides a quantitative measure for integrating on schedule and cost information. It also evaluates work progress in order to identify potential delay and cost overruns. South Korea had not used this concept until 2000, when the Korean government legislated that EV should be used in construction projects of more than 50 million dollars. In order to effectively implement EV in the Korean context, several reforms must be made regarding its unique conditions, such as the cost accounting system. This paper seeks to integrate cost as related to bill of quantity and schedule in a manner that is suitable for application in Korea. An example application of the proposed EV model to two actual separate projects is provided.
著者関連情報

この記事は最新の被引用情報を取得できません。

© 2008 Architectural Institute of Japan
前の記事 次の記事
feedback
Top