鋳造工学
Online ISSN : 2185-5374
Print ISSN : 1342-0429
ISSN-L : 1342-0429
研究論文
複合脱酸処理による球状黒鉛鋳鉄の薄肉化に及ぼす酸素及び硫黄の影響
王 麟桃野 正
著者情報
ジャーナル フリー

2006 年 78 巻 7 号 p. 357-361

詳細
抄録

  It has been reported in present paper that 2mm thick section can be made without chill structures in vacuum depressurization processing. This paper describes a method to shorten the decompression processing time. Holding time in vacuum was decreased within five minutes with a addition of CaC2 into molten iron in vacuum in this study. Total oxygen, dissolved oxygen and sulfur content in melt were decreased rapidly at a time. The greatest nodule count of 2mm thickness specimen was obtained with a addition of 1%CaC2 and 2mm thickness specimen was produced without chill. When 2%CaC2 was added into the melt, chill structure was observed in 2mm thickness specimen. The results demonstrated that there is an appropriate amount of CaC2 addition.

著者関連情報
© 2006 公益社団法人 日本鋳造工学会
前の記事 次の記事
feedback
Top