2016 年 2 巻 37 号 p. 1323-1326
The results of series field test on piles on strategic oil and gas site in Kazakhstan are presented in this paper. The test include: static load test in accordance with ASTM and Kazakhstan standards (GOST), dynamic load test in accordance with GOST and pile driving analyzer (PDA) in accordance with ASTM. The difference of standards procedures and test results is presented.