A Heuristic Algorithm to Minimize Total Holding Cost of Completed and Processing Production Job-Shop Scheduling Subject to No Tardy Jobs
Toshihiro NakataniHiroshi Ohta
Author information
JOURNAL FREE ACCESS

2003 Volume 53 Issue 6 Pages 483-490

Details
Abstract
This paper considers the job-shop scheduling problem of minimizing the total holding cost of completed and processing products subject to no tardy jobs since meeting due dates is the most important goal of scheduling if the due date of each job has been promised to its customer. A heuristic algorithm based on the shifting bottleneck procedure is proposed for solving the minimum total holding cost problem subject to no tardy jobs. The purpose of this paper is that larger size problems, for example a problem comprising 15 jobs and 15 machines, and more severe due dates problems can be effectively solved. The proposed algorithm decomposes the job shop problem into a number of single-machine problems with ready time and due time constraints. Each decomposed problem is strictly solved by a branch and bound algorithm using new due dates for each operation decided by considering to meet prespecified due dates and minimizing objective functions, simultaneously. We used an elimination method adapted for a single-machine problem at any node to directly select some disjunctions or at least to determine whether or not a potentially optimum solution can be obtained. In this way, the branch and bound tree is trimmed efficiently. Some benchmark problems used by job-shop scheduling to minimize makespan are solved by the proposed algorithm and the results are reported.
Content from these authors
© 2003 Japan Industrial Management Association
Previous article Next article
feedback
Top