Journal of Japan Industrial Management Association
Online ISSN : 2432-9983
Print ISSN : 0386-4812
The Elimination of Interference Time Caused by the Variation of Operation Time : The Solution of Problems as to the Design of Flow Line in Job Shop (Part 1)
Toshio UENO
Author information
JOURNAL FREE ACCESS

1974 Volume 25 Issue 2 Pages 115-120

Details
Abstract
In a flow line system designed by the mixed lot of operation times to each of the different parts, interference time exists because of the variations of the operation times. In this paper, we consider a theoretical solution of this interference time and its elimination. We suggest the delay of production time that seems to arise in actual application of this elmination, and the actual advantageous application of this system by applying the theoretical formula for little more delay than seems to arise when the interference time is not eliminated.
Content from these authors
© 1974 Japan Industrial Management Association
Previous article Next article
feedback
Top