Abstract
This paper deals with an optimal operation planning for the fixed quantity withdrawal Kanban system with variable leadtime and different consumption rate of parts for each period. The behaviour of the optimal planning (the optimal container capacity) which minimizes average total operation cost is shown by means of simulations under various values of parameters : the order cost factor, the range of consumption rate of parts and the range of leadtime for delivery.