Heap-model-based scheduling of ship building lines for tandem construction of a pair of ships
Tomoya IwashitaHiroyuki Kajiwara
Author information
JOURNAL FREE ACCESS

2015 Volume 21 Pages 83-91

Details
Abstract
This paper aims to develop further our previous work, which is concerned with a just-in-time scheduling problem of block-assembly lines lines conveyorized in a shipyard. The blocks fabricated are stocked for pre-fitting and painting works and they are provided to pre-election area. We proposed a new method called as Max-Plus Method to solve the problem. In some cases, however, this method can’t satisfy a synchronization constraint that pre-subblocks must be fabricated before the specific subblocks are fabricated. Also it can’t manage the stockyard very well except the utilization of round-robin type. In the paper, another new method called as Heap Method is proposed, which is inspired from the Heap Model in the field of Max-Plus algebra. It is shown that the above unsolved problems can be solved.
Content from these authors
© 2015 The Japan Society of Naval Architects and Ocean Engineers
Previous article Next article
feedback
Top