日本オペレーションズ・リサーチ学会論文誌
Online ISSN : 2188-8299
Print ISSN : 0453-4514
ISSN-L : 0453-4514
A 3-APPROXIMATION LIST SCHEDULING ALGORITHM FOR A SINGLE-MACHINE SCHEDULING PROBLEM WITH A NON-RENEWABLE RESOURCE AND TOTAL WEIGHTED COMPLETION TIME CRITERION
Susumu HashimotoShinji Mizuno
著者情報
ジャーナル フリー

2022 年 65 巻 4 号 p. 151-171

詳細
抄録

This paper studies a single-machine scheduling problem with a non-renewable resource (NR-SSP) and total weighted completion time criterion. The non-renewable resource is consumed when the machine starts processing a job. We consider the case where each job's weight in the objective function is proportional to its resource consumption amount. The problem is known to be NP-hard in this case. We propose a 3-approximation list scheduling algorithm for this problem. Besides, we show that the approximation ratio 3 is tight for the algorithm.

著者関連情報
© 2022 The Operations Research Society of Japan
次の記事
feedback
Top