Journal of Historical Studies in Civil Engineering
Online ISSN : 1884-815X
Print ISSN : 1349-5712
ISSN-L : 1349-5712
A Posteriori Evaluation of Large-scale Infrastructure from the Viewpoint of Development Process
A Case Study of Development in Tomakomai Port, Hokkaido
Satoru HINOMasato HARAGUCHIKunihiro KISHIKeiichi SATOH
Author information
JOURNAL FREE ACCESS

2004 Volume 23 Pages 5-12

Details
Abstract

In this study, we evaluate the development in Tomakomai port utilizing a policy evaluation model. And, we proposed a new measurement for a posteriori evaluation. For evaluating a development process, we propose a process evaluation model. It is a feature in this study that we utilized a newspaper and an interview survey for evaluating a development process. Although some suppositions in the original plan are not realized, the result in the logic model is obtained by revision of the development process. As a result, it is clarified that a proposed model is one of the effective posteriori evaluation models.

Content from these authors
© by Japan Society of Civil Engineers
Previous article Next article
feedback
Top