Development on Stepwise Scheduling System of Concrete Placement for Concrete Dam
Toshiaki OritaAtushi Murabayashi
Author information
JOURNAL FREE ACCESS

1991 Volume 9 Pages 197-204

Details
Abstract

The concrete placement must be executed with consideration for weather conditions to prevent defects such as thermal cracking and frost damage of the placed concrete. Futhermore the dam site is usually located where is difficult to procure material and for that reason the concrete placement is strongly infuluenced by shortage of material. So as to satisfy these requirements we developed a scheduling system, linking with quality control and material control, and then the following plans can be made automatically and quickly by utilizing this system.
(1) the quality assurance schedule, (2) the detailed work schedule adjusted to the project control schedule, (3) the material procurement plan based on schedule

Content from these authors
© by Japan Society of Civil Engineers
Previous article Next article
feedback
Top