土被り600mを超える不良地山に対する支保構造について
矢野 寛西谷 誠之橋本 隆之築地 功越後 健司
著者情報
ジャーナル フリー

2002 年 12 巻 p. 407-412

詳細
抄録

In HIDA tunnel, there is clayey crush zone and hydrothermal altered zone continuously. So, the phenomenon of trapping TBM, push out a face in NATM method and increase of inside displacement happens at the refuge tunnel. The hydraulic head pressure which is equal to thickness of earthcovering is cofirmed by boring, as the rock pressure is increasing due to high earth covering which is 400-600m. Therefore we selected the most suitable construction of tunnel supports which match excessive high rock pressure and high hydraulic head pressure, and undertook construction.