Abstract
Generally, the bench cut excavation is adopted in squeezing rock. However, advancing drift is used as auxiliary method for the occurrence of large-scale earth pressure in Nikkureyama Tunnel II. This paper studies field measurement data of, Nikkureyama tunnel II. It examines the effect of bench cut and advancing drift by using 3D-FDM. Also, it proposes optimum drift length and bench length from the above result.