A CONSIDERATION ON TUNNEL PRESSURE DERIVED FROM THE TERZAGHI'S FORMULA BASED ON AN EQUILIBRIUM ASSUMPTION IN A LIMIT STATE
Released on J-STAGE: June 27, 2011 | Volume 8 Pages 95-100
Shinichi AKUTAGAWA, Tsutomu KITANI, Yasunori ABE, Shunsuke SAKURAI
A STUDY ON JACK THRUST AND CUTTER TORQUE FOR EXCAVATION WITH SLURRY SHIELD
Released on J-STAGE: June 27, 2011 | Volume 6 Pages 387-392
Noritake NISHIBAYASHI, Ikuo FUJIKI, Satoshi TAKAHASHI
The prior measure and construction situation, Which were carried out by TBM in a lot of groundwater
Released on J-STAGE: June 27, 2011 | Volume 13 Pages 219-224
Takaaki YAMADA, Masatsugu KAWAKITA, Shigeru KANJOU, Isao TSUKIJI
AN EVALUATION OF PULL-OUT TEST RESULTS FOR CONTROLLING THE QUALITY OF THE INSTALLED ROCKBOLT
Released on J-STAGE: June 27, 2011 | Volume 4 Pages 417-422
Tetsuo NAGAI, Jian-Sheng SUN, Shogo KUNIMURA, Takeshi IKEJIRI
PREDICTION OF GROUND MOVEMENT DUE TO SHIELD TUNNELING
Released on J-STAGE: June 27, 2011 | Volume 9 Pages 243-248
Kunio FUJII, Hideto MASHIMO, Toshiaki ISHIMURA, Hidemoto MAYUMI
Journal of Japan Society of Civil Engineers, Ser. F1 (Tunnel Engineering)
Doboku Gakkai Ronbunshuu F
JOURNAL OF TUNNEL ENGINEERING, JSCE
Already have an account? Sign in here