垂直縫地ボルトによるトンネル坑口部地山安定対策工とその効果に関する挙動計測結果について
中山 隆大宮 貴治長沼 泉斎藤 和男寺本 哲
著者情報
ジャーナル フリー

1995 年 5 巻 p. 143-148

詳細
抄録

This paper describes the measures taken to stabilize the slope above a tunnel portal during construction. In Takasaki Tunnel, Chiba Prefecture, geology of the portal section is very poor, which consists of highly weathered mudstone. Vartical earth stitching bolts were installed prior to the tunnel excavation to minimize the influence of excavation on slope stability. The behavior of the ground and support works including earth stitching bolts were monitored during construction. The observed data indicate that vertical earth stitchng boltseffectively worked to reduce the subsidence of the ground and then to maintain slope stability.