JSAI Technical Report, Type 2 SIG
Online ISSN : 2436-5556
Design of Mixed Agile Project Considering Rework by Requirement Change
Taiga MITSUYUKITakuya GOTOKazuo HIEKATABryan MOSER
Author information
RESEARCH REPORT / TECHNICAL REPORT FREE ACCESS

2017 Volume 2017 Issue KST-30 Pages 05-

Details
Abstract

Many IT venders need to adopt a mixture of waterfall and agile development, which is called mixed agile. In order to manage the mixed agile projects, project managers have to design the agility of the development process considering rework caused by requirement change. This study proposes a design method for mixed agile project. To be concrete, a new model to represent the agility for simulation of mixed agile process is proposed and a simulator which evaluates the mixed agile project based on the agility model is developed. A case study shows a demonstration of project design using the proposed method. The sensitivity analysis in changing the product 's structure and the process's agility is conducted and the result shows the usefulness and availability of the proposed method.

Content from these authors
© 2017 Authors
Previous article Next article
feedback
Top