Infrastructure Maintenance Practices
Online ISSN : 2436-777X
OVERLAY REPAIR MEASURES FOR SLABS USING J-THIFCOM THAT CONTRIBUTES TO INFRASTRUCTURE DEVELOPMENT AND CONFIRMATION OF EFFECTIVENESS AFTER TWO YEARS
KATSUHIKO HiranoYAMATO NishizawaHIROSHI MitamuraTAKASHI Matsumoto
Author information
JOURNAL FREE ACCESS

2023 Volume 2 Issue 1 Pages 204-208

Details
Abstract

 On a heavy traffic route where infrastructure maintenance is important, the Hosen Viaduct, located at the railroad intersection of Yokohama Shindo, has been in service for 48 years since 1971. The reinforced concrete slabs have deteriorated and damaged due to aging and traffic loads, and it was necessary to repair them immediately to ensure their load-bearing capacity. The repair of slabs is generally performed by partial or full-layer replacement of the damaged part. However, as a measure to prolong the service life of the slabs until drastic measures are taken, a partial replacement of the slab concrete with J-THIFCOM was performed on the top surface of the slabs, and the effect of the repair was subsequently verified

Content from these authors
© 2023 Japan Society of Civil Engineers