土木学会論文集
Online ISSN : 1882-7187
Print ISSN : 0289-7806
ISSN-L : 0289-7806
青函トンネル本坑最深部施工時の地山挙動と支保効果について
北村 章平野 邦彦深沢 成年早坂 治敏
著者情報
ジャーナル フリー

1987 年 1987 巻 385 号 p. 106-115

詳細
抄録

The Seikan Tunnel was constructed in the weak Tertiary rock beneath the deepest seabed of the Tsugaru Straits. We could clarify the ground behavior during the excavation, and could evaluate the effectiveness of support members through the following research:
(1) The diameter of plastic or loosened zone developed in the grouted zone around the main tunnel was determined by measuring the ground deformation by means of measuring instruments which were set up beforehand from the pilot tunnel.
(2) The effectiveness of support members was evaluated using the following four method: (1) Stress measurement of support members, (2) Deformation analysis by “FEM”, (3) Stability analysis by “the Rabcewicz Theory”, and (4) Analysis of measured deformation.
The results will provide valuable information for the construction of undersea tunnels.

著者関連情報
© 社団法人 土木学会
前の記事 次の記事
feedback
Top