松浦火力発電所貯炭場地盤改良の設計・施工
平川 義行篠原 淑郎宮入 寛雄
著者情報
ジャーナル フリー

1990 年 1990 巻 415 号 p. 171-180

詳細
抄録

The Matsuura thermal power plant is a joint undertaking between Kyushu Electric Power Company and Electric Power Development Company. The formar will install two 700MW units and the latter will install two 1000MW coal fired units, having a combined installed capacity of 3400MW which will be the largest coal fired plant in Japan.
This report shows the outline of design and construction of foundation improvement works for the coal storage yard. The sand compaction pile method was adopted to reduce the settlement of coal yard foundation. And the cement stabilization was carried out to improve the surface soil for the stability of stockpile.

著者関連情報
© 社団法人 土木学会
前の記事 次の記事