Abstract
Rational construction methods of concrete dam are currently being studied and some practical placing methods of concrete are already suggested. However, research upon concrete placing the travelling tower crane has not been in practice.
The automatic placing system of concrete consisting of the travelling tower crane is proposed in this study and structure of the system and working principle are discussed. Applicability of the system into the practical construction has been also confirmed.