Abstract
The purpose of this paper is to apply the neural network to resource allocation in construction scheduling. It is very difficult to solve the resource allocation using LP and so on. The neural network can calculate the time scheduling and resource allocation simultaneously. The procedure entails that there are different resources with some activities carried out using the same resource.
As a result, we find that the neural network could give the optimal schedule at the shortest possible time.