Abstract
It is expected to improve the whole construction process by using the CIM(Construction Information Modeling/Management). Therefore, MLIT(Ministry of Land, Infrastructure, Transport and Tourism) has studied the introduction of the CIM, and has been attempted the CIM in several projects. In this paper, we reports the results of the trial for applying the CIM in the embankment project that is in the construction stage. Based on the results of the trial, we describe the effects of CIM in the construction stage, and we confirm that we can apply the CIM model to the Intelligent Construction.