Journal of Japan Society of Civil Engineers, Ser. F4 (Construction and Management)
Online ISSN : 2185-6605
ISSN-L : 2185-6605
Special Issue(Paper)
Consideration for the type of Construction Management Method and the system on execution, as example of the reconstruction projects for The Great East Japan Earthquake.
Tomonaru HosokawaMasaaki Minami
Author information
JOURNAL FREE ACCESS

2019 Volume 75 Issue 2 Pages I_58-I_72

Details
Abstract

 There are concerns about securing resources and ensuring transmission of skill in the recent construction industry, especially municipal government have more concerns over future public works. Because of these concerns, the needs is growing over introduction of the construction management(CM) method, although the introduction have not become widely. Various approaches have been taken to ensure the effect on introduction, the role of the construction manager, and the system, however, there is not an establish method to figure out how to program the structure of system on execution of the project by the owner.

 This paper, in the aim to figure out how to program appropriate system on execution the CM method, focused on Five essential elements which are derived from various study with the nature of type of CM method. And associates those elements, as example of the CM method utilized in the reconstruction projects for The Great East Japan Earthquake, with feature of the type of CM, then derive the theory of the program management in the construction project.

Content from these authors
© 2019 by Japan Society of Civil Engineers
Previous article Next article
feedback
Top