Doboku Gakkai Ronbunshuu F
Online ISSN : 1880-6074
ISSN-L : 1880-6074
Technical Note (In Japanese)
ESTIMATION METHOD OF ROCK MASSES IN TUNNEL CONSTRUCTION BY CONVERSION ANALYSIS USING SEISMIC VELOCITY AND ELECTRIC RESISTIVITY
Harushige KUSUMIYasutaka TAKAHASHIMakoto NAKAMURA
Author information
JOURNAL FREE ACCESS

2006 Volume 62 Issue 4 Pages 603-608

Details
Abstract
Geophysical exploration for tunnel construction is usually used on seismic method and electric method. However, seismic velocity and electric resistivity directly are not connected with a design for tunnel construction. Grasping the nature of rock masses, for example effective porosity and saturation, is very important for the design of tunnel. In this paper, new estimation method of tunnel construction by conversion analysis seismic velocity and electric resistivity are proposed. As the result, it is recognized that the distributions of porosity and saturation of rock mass around tunnel by this analysis system correspond with that of the real rock mass conditions.
Content from these authors
© 2006 by Japan Society of Civil Engineers
Previous article Next article
feedback
Top