Journal of Japan Society of Civil Engineers, Ser. F1 (Tunnel Engineering)
Online ISSN : 2185-6575
ISSN-L : 2185-6575
Special Issue
ESTIMATION OF WORKING LOADS APPLYING THE DRYING SHRINKAGE IN THE CONSTRUCTION PROCESS OF OPEN CUT TUNNEL BASED ON A RESULT OF SITE MEASUREMENT
Yasushi ARAI, Keiji OISHI, Shikai DU, Takashi NAKAYAMA, Takashi ARUGA
Author information
JOURNAL FREE ACCESS

2015 Volume 71 Issue 3 Pages I_122-I_132

Details
Abstract
 We conducted stress measurement of the reinforcing bar stress transducer which made before structure concrete of cut and cover tunnel placing defaults until the structure construction completion in on a specific site in Fukutoshin line, and presumed the static load of the structure by executing the back analysis about a result which separated thermal stress and the dry shrinkage stress from a measurement stress of reinforcing bar stress transducer. As a result, it was found out that static load of the side wall is lower than the design load and it seemed to be caused by effect of decreasing static load by leaving retaining wall.
Content from these authors
© 2015 Japan Society of Civil Engineers
Previous article Next article
feedback
Top