Journal of Japan Society of Dam Engineers
Online ISSN : 1880-8220
Print ISSN : 0917-3145
ISSN-L : 0917-3145
Construction Example of Japan's Largest Trapezoidal CSG Dam
~Manufacturing and Construction of CSG at Naruse Dam~
Atsushi OHISeita OGURATakaya MATSUMOTO
Author information
JOURNAL RESTRICTED ACCESS

2025 Volume 35 Issue 2 Pages 220-232

Details
Abstract

Naruse Dam is a trapezoidal CSG dam certified as a river structure as part of the Omono River System River Improvement Project, and is the largest multipurpose dam in Japan, the first to exceed 100m in height. Naruse Dam is located in one of the snowiest areas in the Tohoku region, and because pouring cannot be carried out in winter, pouring of CSG and concrete is limited to a seven-month period from mid-April to mid-November. For this reason, the construction of the embankment, the largest of its kind in Japan, was undertaken as quickly as possible while ensuring quality and safety. In this article, we report on construction examples to date, since the pouring of CSG was completed in 2024.

Content from these authors
© 2025 by Japan Society of Dam Engineers
Previous article Next article
feedback
Top