A reactive scheduling method based on GA (Genetic Algorithm) was proposed in the previous research. The method can improve the delayed production schedules by unscheduled changes, without interrupting the progress of the manufacturing process. This research improves the reactive scheduling method for multi-objective problems by using multi-objective GA.