年次大会
Online ISSN : 2424-2667
ISSN-L : 2424-2667
セッションID: S14202
会議情報

熱間圧延工程の燃料原単位を低減する生産計画方式の開発と実証
*堂安 豪永原 聡士智田 崇文勝部 潤一足立 透味田 悟
著者情報
会議録・要旨集 認証あり

詳細
抄録

In order to minimize the fuel cost for heating steel ingots in hot rolling process, it is important to plan (1) batch formation to increase filling rate in furnaces and (2) work schedule to reduce stagnation of ingots in furnaces. A low filling rate increases fuel cost per ingot, and stagnation causes additional fuel cost to keep ingot’s temperature. However, the conventional divide-and-conquer methods cannot realize both high filling rate and small stagnation because of planning batch formation and work schedule sequentially. Therefore, we developed a new scheduling method that plans batch formation and work schedule simultaneously by creating multiple candidates of batch. As a result of the computational experiment, the development method reduced 12.4% fuel cost compared to the conventional method. The developed method has been applied to actual hot rolling line and reduced the fuel cost by 8%.

著者関連情報
© 2020 一般社団法人 日本機械学会
前の記事 次の記事
feedback
Top