年次大会講演論文集
Online ISSN : 2433-1325
セッションID: 1645
会議情報
1645 名神高速道路天王山トンネル電気集じん機帯電部形状変更による効果(S36-3 トンネルの空気力学,換気,火災(3),S36 トンネルの空気力学,換気,火災)
間瀬田 勝久原 康弘戸野 治
著者情報
会議録・要旨集 フリー

詳細
抄録
Because a trouble ratio of the electric discharge line disconnection by the abnormal spark is high, and there is much exchange number of times of the electric discharge line, among trouble to affect the electrostatic precipitator, we have a hard time for maintenance. By repair work of 2006, dust collection unit did it as old JH specifications and changed only charging with electricity department in the electric discharge board method because an electric discharge board method was developed as a solution, and it was made specifications. Therefore as a result of having inspected comparison with the electric discharge line method and the electric discharge board method by calculating electric discharge line disconnection trouble rate that I measure the dust collection efficiency of the existing electric discharge line method and the electric discharge board method after the repair this time, it is availability to repair the electric discharge line method in the electric discharge board method.
著者関連情報
© 2007 一般社団法人日本機械学会
前の記事 次の記事
feedback
Top