Abstract
This research proposes the method of production scheduling that have flexible response. Two different method of scheduling is compared with work in progress and other parameter. Each schedule is calculated by genetic Algorithm. The effectiveness of one method about work in progress is showed by simulation that is performed by using schedule that is got from Genetic Algorithm. In addition, new method of re-scheduling is also proposed. Considering the information of first schedule, re-schedule is easily searched by Genetic Algorithm.