In order to realize smooth curving of LRV, active steering control of railway bogie with indepedently rotating wheel is discussed. In previous study, smooth curving is realized with feedback and feedforward control whereas high speed running stability still problem to be solved. In this study, a roller rig test bench is developped so as to validate the effectiveness of proposed bogie control and structure.