A new re-scheduling procedure is proposed to accept an uncertain irregular job without the reduction of the product volume in the cyclic mass manufacturing. The proposed procedure is focused on idle times existing on every machine except bottleneck machine, and the times are utilized to operate the irregular job. In the present paper, the fundamental concept of the procedure is explained and an example of re-scheduling result is shown.