Abstract
This paper describes the scheduling allocation system on a task and a facility assigned for skilled engineers in a shop floor. Recently a kind of production demanded by domestic factory is noticed to depend on skill of engineers deeply. Hence manufacturing information included such the skill cannot be analyzed and predicted exactly enough to be difficult to translate it into FA. This research proposed scheduling allocation system considering of the skilled engineers based on the sensibility evaluation quantified that distributes task, facility and the engineers informed in gantt chart.