生産システム部門講演会講演論文集
Online ISSN : 2424-3108
会議情報
2104 ニューラルネットワークを用いた納期遅れコストと段取り時間の二目的スケジューリング : SA による学習
江口 透大場 史憲大貫 純也
著者情報
会議録・要旨集 フリー

p. 35-36

詳細
抄録
This report proposes a scheduling method for a bi-criteria job shop scheduling problem. The criteria considered in this report are tardiness cost and sequence-dependent setup time. Two priority rules each of which is effective to each scheduling criterion are used to make a composite dispatching rule. One of the two rules is SIMSET rule that selects the next job with the shortest setup time SIMSET rule can make effective schedules with regard to average setup time. The other rule is constructed using a neural network. This neural network is trained by a simulated annealing method to make effective schedules with regard to tardiness cost. The proposed composite rule has the parameter α and can make effective bi-criteria scheduling by tuning it. Numerical experiments show that the effectiveness of the proposed rule.
著者関連情報
© 2003 一般社団法人 日本機械学会
前の記事 次の記事
feedback
Top