This paper describes an implementation of the Integrated Construction Process Management System, which includes manufacturing process management features for building parts, and also includes construction process management features at construction site. To observe the flow of the building parts, RFIDs are stuck to all of the parts and work-in-processes (WIPs) to be managed, and several checkpoints, which we named "gates", are introduced within the coherent process through part-manufacturing and building construction. This system gathers production data by reading RFIDs on managed objects, and analyzes the data with event-driven data processing system, which is built on the real-time control infrastructure system, which we named "Glue Logic." The trial implementation of this management system was built and tested in an actual construction site, and its feasibility and effectiveness were confirmed.